Skip to content

Introducing

Five Thirty B

Series of renovation projects totaling 600,000 sq. ft. in downtown San Diego.

Project

DETAILS

Multiple renovation projects to revitalize this iconic building in the heart of downtown San Diego. In addition to refreshing the existing conference center, building lobby and elevator cabs, the Prevost team has delivered a new management office for Kearny on the 18th Floor and new spec suites on the 10th, 14th, 15th, and 19th Floors of the building. ADA upgrades and restroom renovations have commenced on multiple floors while also coordinating the process of installing a Teflon coating installation by NuFlow into all of the existing waste and storm water systems throughout the entire building. The new coating process was chosen in lieu of replacing all of the waste and vent piping within the building which resulting in a substantial cost savings to Kearny Real Estate.

Spotlight

FEATURES

Every project is fully customized to satisfy the specific needs of our client’s business. Here are a few features that make this space especially unique.

360° Views

of Downtown San Diego in private outdoor meeting room

70 Person Boardroom

Recently upgraded conference facility houses dedicated lobby, restroom facilities, and a catering services area

Mural by Local Artist

30x150" mural by local artist Maxx Moses

DREAM TEAM

COLLABORATORS

PARTNERS
SUBCONTRACTORS